Packaged plants
Weining township PPP
Six new township plants under the Weining PPP, each 500–900 m³/d, using A²O + MBR packaged equipment. Supply, installation, and commissioning. Put into operation in 2021. Published effluent requirement: Class 1A of GB 18918-2002.
- Capacity
- 500–900 m³/d, six plants
- Place
- Weining County
- Role
- Supply, installation, and commissioning of six A²O + MBR packaged plants.
- Period
- 2021
- Published standard
- GB 18918-2002 Class 1A.
What this page does not add
There is no site photograph, no influent analysis, and no client quotation beyond the capacity and the role wording above. If you are comparing a similar duty, send the water and the standard. An engineer will reply within two business days.
